Skip to content
Pune, Thursday, 26 November 2026 31°C AQI 43

Top stories

All news
City News

Bhide Bridge Closed to Vehicles till 31 December for Metro Footbridge: Alternate Routes

Bhide Bridge over the Mutha in Deccan is closed to all vehicles until 31 December 2026 while Maha Metro builds a footbridge from Deccan Gymkhana metro station to the Peth areas. Use Lakdi Bridge, Balgandharva Bridge, Z Bridge or the riverbed road.

By Sham Rathi ·

Bhide Bridge Closed to Vehicles till 31 December for Metro Footbridge: Alternate Routes

If you cross the Mutha river between Deccan and the Peth areas, plan another route this December. Bhide Bridge (Baba Bhide bridge) is closed to all vehicles from 6 am on Thursday, 19 November, until 31 December 2026.

Why it is closed

Pune Metro is building a pedestrian bridge above Bhide Bridge. It will connect Deccan Gymkhana metro station with the Peth side of the river.

Read also: Pune Airport: 15-Minute Limit in Pick-up and Drop Lanes, Rs 500 Fine from 1 December 2026

When it is ready, people from Narayan Peth, Shaniwar Peth and the Laxmi Road area will be able to walk to the metro station easily, and students going to the colleges and schools in Deccan will also benefit. Pune Metro has said the footbridge will be finished as soon as possible.

Routes to use instead

  • Lakdi Bridge (Sambhaji Bridge)
  • Balgandharva Bridge
  • Z Bridge
  • The riverbed road along the Mutha stays open during the closure.

Tips

  • Expect slow traffic on Lakdi Bridge, Tilak Road, JM Road and around Deccan at peak hours. Leave a little early.
  • For Deccan, Fergusson College Road and JM Road, the metro is a good option: get off at Deccan Gymkhana station.
  • Check Google Maps for live traffic before you start.

Pune Metro has regretted the trouble and asked citizens to cooperate and plan their trips.

Questions and answers

Till when is Bhide Bridge in Pune closed?

Bhide Bridge is closed to all vehicles from 19 November until 31 December 2026.

Why is Bhide Bridge closed in December 2026?

Pune Metro is building a pedestrian bridge above it to connect Deccan Gymkhana metro station with the Peth areas.

Which bridges can I use while Bhide Bridge is closed?

Lakdi Bridge, Balgandharva Bridge and Z Bridge. The riverbed road along the Mutha also stays open.

Follow PuneDiary on Facebook Daily Pune news, events and updates in your feed. Join 13,000+ Punekars.
Filed under: City News

Share this story

More Pune news

Something wrong or missing on this page? Suggest a correction
Our team checks every suggestion before the page is changed.